ADU Builders in Ventura County

An accessory dwelling unit is the one addition California lets you build by right on nearly any single-family lot, and homeowners here use that right for granny flats, casitas, in-law suites and long-term rentals. Master Construction designs, permits and builds them under a single contract, Lic. #1027281, family owned since 1994, and that one contract is what separates ADU builders in Ventura County from framers who leave you to find an electrician. As of 2026 the state guarantees an 800 sq ft detached unit and a 15-business-day completeness check. The hard parts of an ADU here are the sewer lateral, the electrical panel and whichever overlay your lot sits in, and those get answered at the first site walk.

Four Ways to Add an ADU in Ventura County

A detached new build is the unit most people picture: a stand-alone casita in the back yard with its own door, kitchen and bath, for an owner who wants real separation. The state floor is 800 sq ft with 4 ft side and rear setbacks. Distance decides its cost: how far sewer, water and power travel from the house to the new slab.

An attached ADU shares a wall with the house and has its own exterior entrance. It suits narrow lots where a detached unit would eat the yard. State law caps it at half the floor area of the existing house, with the same 800 sq ft floor protecting smaller homes. Structure decides its cost. Tying a new roof and foundation into a 1960s house is where the money goes, which is residential construction work.

A garage conversion turns existing square footage into the unit and is the lowest-cost route on most tract lots. No setback applies, no replacement parking can be required, and the structure may grow by up to 150 sq ft for an entrance. The slab decides its cost: a garage floor sits low and is rarely insulated, so our home renovations crew reads it before anyone prices a kitchen.

A junior ADU is no more than 500 sq ft carved out of the house itself, with its own outside door and an efficiency kitchen. It can share a bathroom with the house and suits an in-law suite or a first-time landlord. The state exempts a JADU from parking, separate utility connections and impact fees. The kitchen decides its cost: its own bath and a real cooking wall make it a small remodel; a shared bathroom makes it mostly a door and a counter.

What the 2026 Rules Let You Build in Ventura County

State law, as of 2026, guarantees two units on any lot with a single-family house: one conversion unit inside existing space, and one new detached ADU of up to 800 sq ft with 4 ft side and rear setbacks, 16 ft tall or 18 ft near major transit. No city can refuse that pair. Beyond it a city sets its own maximums, never below 850 sq ft of interior livable space, or 1,000 sq ft for more than one bedroom, and a detached unit tops out at 1,200 sq ft of total floor area. No impact fees apply at 750 sq ft of interior livable space or less.

The clocks got shorter on January 1, 2026. Under SB 543 every permitting agency, water district and fire department included, has 15 business days to say whether the application is complete; miss it and the application is deemed complete. The older 60-day decision clock still runs from there, with 30 days for a detached unit on a pre-approved plan. No owner-occupancy requirement applies to an ADU, and under AB 1154 none applies to a JADU with its own bathroom. Cities can hold rentals to 30 days or longer.

Cities still decide design standards on units beyond the by-right pair. In the coastal zone, which covers parts of Ventura, Oxnard and Port Hueneme, an ADU still needs a coastal development permit, though since AB 462 it runs on the same 60-day clock with no hearing. Inland, the 2025 fire maps put more of Moorpark, Simi Valley, Thousand Oaks and Ojai in Very High severity zones, where a new detached unit is built to the WUI code (formerly Chapter 7A): Class A roofing, ember-resistant vents, tempered glass.

Ventura County and the City of Ventura offer the same three free detached plans at 700, 900 and 1,188 sq ft, and Moorpark posts the same three sizes as structural-only sets. Oxnard accepts the county set. Thousand Oaks runs a gallery of 17 plans, ten of them prefabricated units already reviewed for code. Ojai offers a free one-bedroom. Camarillo and Simi Valley publish no plan library, we found none for Fillmore or Port Hueneme, and Santa Paula's are still marked draft. A pre-approved plan trims plan check, not site work. Site work is what ADU builders in Ventura County are hired for, and our design and planning team starts there.

Utilities Are the Number People Miss on an ADU

Sewer first. A backyard unit normally ties into the house's existing lateral, and plan check looks at its capacity and cleanout, so we camera the line at the site walk. On septic, in Somis, the Ojai Valley outside the sewer and the hills above Santa Paula, Environmental Health sizes the system by bedrooms and fixtures, and the ground around the tank and leach field must stay open to the sky, which can decide where the unit goes. A conversion or JADU stays on the house water meter; a new detached unit may owe its own connection, and our plumbing crew runs it either way.

The main panel is the threshold question on an older house. Many homes here still carry 100-amp service, and an all-electric unit with a heat pump and induction range often does not fit on it. A subpanel off the main is the usual answer; when it is not, an SCE service upgrade is, and SCE sets its own field schedule, so we order it early. Our electrical crew runs the load calc at the site walk. A separate meter is optional, and so is gas; many new detached units go all-electric.

Solar comes with the building. For permits pulled since January 2026 a newly built detached ADU needs its own new PV system; the house's array does not count, and our solar crew sizes it with the load calc. Attached units and garage conversions carry no solar mandate. Sprinklers cannot be required unless the house has them. Then the dirt: the trench from house to unit, grading that keeps runoff off the slab, and the concrete itself.

One Contract From ADU Drawings to Keys

As ADU builders in Ventura County we run every unit through five steps under one contract.

  • Feasibility read. We walk the lot, camera the lateral, read the panel and check the zone, coastal, fire and septic maps, then tell you which unit type fits.
  • Design and drawings. We draw the unit or adapt a pre-approved plan, with structural, Title 24 and solar sheets and a site plan the city and fire department can approve.
  • Permit and plan check. We file with the city or County RMA plus any coastal, fire or Environmental Health desk and answer every correction inside the state clocks.
  • Build. Foundation, framing, roof, rough trades, insulation, drywall and finishes on one schedule; trenching and any SCE upgrade go first.
  • Inspections and keys. Final inspection, certificate of occupancy and a walkthrough with the punch list closed before keys change hands.

Property managers, HOA boards and investors get the same process. On an existing multifamily lot the state allows conversion units up to a quarter of the unit count, plus up to eight detached units and never more than the units already there. Investors get a written fixed-price scope and a schedule for the pro forma. Boards get a review package built around Civil Code 4751 and standing certificates of insurance, like our HOA and property maintenance clients. Request a quote or call (805) 667-8800.

  • Detached backyard ADUs & casitas
  • Garage conversions
  • Attached ADU additions
  • Junior ADUs inside the house
  • Pre-approved plan adaptation
  • Design, permits & plan check
  • Panel upgrades & utility trenching
  • Multifamily & investor ADU programs

Proudly serving Ventura, Oxnard, Camarillo, Thousand Oaks, Newbury Park, Simi Valley, Moorpark, Agoura Hills, Westlake Village, Santa Paula, Fillmore, Ojai, Port Hueneme, Somis, and Calabasas, plus all of Ventura & Los Angeles Counties.

Reviews

What Our Clients Say

Rated 5.0 from 41 reviews on Google

All Google Reviews

★★★★★

Great company to work with. Professional, reliable, and committed to quality from start to finish. Communication is excellent, the team is knowledgeable, and they always take pride in their work. I highly recommend them to anyone looking for a trustworthy construction company.

Christian HudakGoogle Review

★★★★★

Working with Josh and his team was such an amazing experience. They were professional, always on time, and the quality of their work is unmatched. 1000/10 will always refer !!

Taylor RaeGoogle Review

★★★★★

Masters construction remodeled my kitchen, and I have been extremely satisfied with all aspects of working with this company. They are a family business that did a fantastic job! They listened, had good ideas, were responsive, and worked hard every day showing pride in their craft. I am extremely happy with the new look.

Rosa DominguezGoogle Review

FAQ

ADU Construction - FAQ

Who is the best ADU builder in Ventura County?

The best ADU builder is the one that owns the whole job: drawings, plan check, utilities, trades and inspections under a single license. Ask any candidate who runs the sewer camera, who does the electrical load calc, and who answers the city's correction letter, because the answer 'a sub' means you are the project manager. Master Construction designs, permits and builds ADUs across Ventura County under Lic. #1027281, family owned since 1994, with design, electrical, plumbing and concrete crews that share one office. You sign one fixed-price scope, and the office is at (805) 667-8800.

How much does an ADU cost in Ventura County?

Unit type sets the range before anything else. A garage conversion reuses a slab and a roof; a detached new build pays for a foundation, a full shell and every utility run across the yard. After type, the drivers are size, the distance to the sewer lateral, whether the main panel takes a subpanel or needs an SCE service upgrade, overlays like the coastal zone or a fire zone that dictate materials, and finish level. Pre-approved plans trim design fees, not site work. We walk the lot, camera the lateral and read the panel, then write a fixed-price scope that holds through the build.

How long does it take to build an ADU in Ventura County?

Plan on design and permitting first, then construction. As of 2026 state law gives every permitting agency 15 business days to call an application complete and 60 days to approve a complete one, with a 30-day decision for a detached unit on a pre-approved plan, so the permit clock is now written into statute rather than left to the counter. Construction runs longest for a detached new build with a foundation, shell and utility trench, and shortest for a garage conversion or JADU. An SCE service upgrade can add weeks on its own clock, which is why we order it first. The schedule is part of the contract, and you hear from us every week.

Are there pre-approved ADU plans in Ventura County?

Yes, in most of the county. Ventura County and the City of Ventura each offer three free standardized detached plans at 700, 900 and 1,188 sq ft; Moorpark posts the same three sizes as structural-only sets; Oxnard accepts the county set and San Diego County's plans with a 30-day review; Thousand Oaks runs a gallery of designer plans pre-reviewed by the city; Ojai offers a free one-bedroom in three styles. Camarillo and Simi Valley publish no plan library, we found none for Fillmore or Port Hueneme, and Santa Paula's are still marked draft. A pre-approved plan shortens plan check. The site plan, foundation, utility runs and any coastal or fire overlay are still engineered for your lot.

Can I convert my garage into an ADU?

Almost always. State law lets you convert an attached or detached garage with no setback requirement and no replacement parking, and an existing structure can grow by up to 150 sq ft for an entrance. A conversion carries no solar mandate under the 2025 Energy Code. What decides the job is the slab and the shell: garage floors sit low, are rarely insulated and often need a moisture barrier or a new pour, the header over the old door gets framed in, and the walls need insulation, egress windows and a bathroom the existing lateral can serve. We read all of that at the site walk before pricing a kitchen.

What changes if my lot is in the coastal zone, a fire hazard zone or on septic?

Each one adds a desk, not a veto. In the coastal zone an ADU needs a coastal development permit alongside the building permit; since AB 462 it runs on the same 60-day clock with no public hearing and no appeal to the Coastal Commission. In a Very High fire hazard severity zone under the 2025 maps, a new detached unit is built to the WUI code (formerly Chapter 7A): Class A roof, ember-resistant vents, protected eaves, tempered dual-pane glass. On septic, Ventura County Environmental Health has to approve the system, sized by bedroom count, and may ask for a percolation test from the last five years. We route all three inside the same permit package.

Can I rent out my ADU in Ventura County?

Yes, as a long-term rental. State law bars any owner-occupancy requirement on an ADU, so you can rent the house, the unit or both. Cities may require rental terms of 30 days or longer, and the by-right units and JADUs must be rented for longer than 30 days, so plan on a long-term tenant, not a vacation listing. Cities and the County collect an estimated-rent form with the permit application for the state's housing report; it is not rent control. A JADU that shares a bathroom with the house still requires the owner to live in one of the two units; a JADU with its own bathroom does not.

Can my HOA stop me from building an ADU?

No. Civil Code 4751 makes any CC&R provision that prohibits or unreasonably restricts an ADU or JADU on a single-family lot void and unenforceable, and Civil Code 714.3 applies the same rule to deed covenants outside an association. Since mid-2025, 714.3 also says a 'reasonable restriction' may not include fees or other financial requirements. Architectural review can still run, and a board may hold you to objective design standards like materials and style, but it cannot act as a veto and it cannot influence the city's decision on the permit. We prepare the review package with the building drawings so the board sees the same set the city does.

Do you handle design, permits and construction for the ADU?

Yes, all three under one contract. Our design team draws the unit or adapts a pre-approved plan, produces the structural, Title 24 energy and solar sheets, and files with the city or County RMA plus any coastal, fire or Environmental Health desk. We answer the plan check corrections, order the SCE work early, then build with our own electrical, plumbing, concrete and framing crews on one schedule. Inspections, the certificate of occupancy and the final walkthrough close it out. Licensed and insured, Lic. #1027281, family owned since 1994. Call (805) 667-8800 to book the site walk.

Inquiries

Room in the Yard, or a Garage You Never Park In?

Call (805) 667-8800 for a feasibility read on any lot in Ventura County, before you spend a dollar on plans.