Your ADU Contractor in Westlake Village
Design, Permits & Build · Licensed & Insured · Lic. #1027281
A detached cottage behind a 1970s ranch house on a flat lake-basin lot, finished in the house's stucco and roof pitch, is the ADU an 8,000 sq ft Westlake Village lot usually ends up with. Two facts decide feasibility: which side of the county line the parcel sits on, since a Westlake Village address with a Thousand Oaks permit desk is common, and whether the lot is mapped Very High Fire Hazard Severity Zone under the March 2025 CAL FIRE update, which sets the exterior spec and adds a fuel modification plan. Master Construction is family owned since 1994, licensed and insured under Lic. #1027281, and works as ADU builders in Westlake Village on one contract from feasibility read to keys.
Why Westlake Village Builds ADUs
Westlake Village was master planned from 1963 around a man-made lake, and most of its single-family tracts follow one pattern: an R-1 lot of 8,000 sq ft or more, a slab-on-grade stucco house from the late 1960s through the 1980s, and an attached two-car garage a few feet from the panel. A flat basin lot leaves room for a detached unit inside the 4 ft side and rear setbacks and the 10 ft separation from the house. Detached garages are rare, so a garage conversion here means the attached garage. In the townhome belts at Village Green and Watergate, an owner rarely has anywhere to put a unit.
Demand comes from families first. The original buyers of the 1960s and 1970s houses are now in their 70s and 80s and want to stay on their street, and an in-law suite or a single-story granny flat is the accessory dwelling unit that keeps them there. Adult children priced out of the market are the second group. The third is the business park north of the 101: Bank of America, the Four Seasons and Costco together employ more than 1,500 people in the city, and a casita rented to one of them for 30 days or longer is lawful under the city code.
Fire is the constraint. On a lot CAL FIRE's March 2025 maps put in the Very High Fire Hazard Severity Zone, a new habitable structure needs a Fuel Modification Plan approved by LA County Fire's Forestry Division before the building permit issues, and from 1 January 2026 the County plan-checks it against the 2025 California Wildland-Urban Interface Code, the successor to Chapter 7A. Class A roof. Ember-resistant vents. Ignition-resistant walls, tempered multi-pane glazing, rated doors.
Westlake Village ADU Permits: City Clearance, County Plan Check
Two agencies sign off, in order. The City of Westlake Village Planning Department reviews the unit against Municipal Code Section 9.14.070 and issues a Zoning Clearance, an administrative approval with no hearing. The form asks you to confirm the parcel is inside city limits with the Zoning and Neighborhood Finder and to upload proof of HOA approval, so the association package moves first. The building permit, plan check and inspections then run through Los Angeles County Public Works Building & Safety, under contract to the city, at the Calabasas District Office, 27001 Agoura Road, Suite 250, with applications filed through the County's EPIC-LA portal.
The city publishes no pre-approved ADU plans. Its ADU page points instead to the County's garage conversion program: Standard Notes and Details for converting a single-story garage under 1,200 sq ft, or carving a JADU under 500 sq ft out of the house, with no added footprint. The County's three free detached standard plans were written for unincorporated land, so we ask the Calabasas desk first whether a city lot may use them. Under the city standard a detached unit runs to 850 sq ft with one bedroom or 1,000 sq ft with two or more, 16 ft tall on most lots, and its color, materials, windows and roof pitch must match the main house. State law guarantees 800 sq ft detached on any single-family lot regardless.
The address decides which desk an ADU contractor in Westlake Village files with. North Ranch, Westlake Hills and Foxmoor carry Westlake Village addresses in the 91361 and 91362 ZIPs but sit in the City of Thousand Oaks, and their ADUs go through Thousand Oaks; Lake Sherwood addresses are Ventura County as well. First Neighborhood, Westlake Island, Lakeshore, Southshore, Three Springs and Westlake Trails are in the city; six original tracts carry recorded standards that override the general code. Hillside lots on the canyon edges add Chapter 9.17 grading review and, near a protected oak, a tree permit with an arborist report. The 2026 state clocks apply to the whole chain: each permitting agency has 15 business days to say in writing whether the application is complete, then 60 days to approve or deny it, or it is deemed approved.
Why Westlake Village Homeowners Choose Us
One contract covers the whole unit. A rear-yard ADU behind a 1972 house means a fifty-year-old sewer lateral, a load calculation against a 100- or 125-amp panel, a new slab, a Class A roof and a stucco finish that must match the house. Our electrical crew handles the panel upgrade and SCE coordination. Our plumbers run the lateral and the water line, our concrete crew pours the slab, and our drywall and roofing crews close it up. One superintendent, one schedule.
Design, permit and build sit under one roof through our design-build practice, which is what the two-agency process here asks of ADU builders in Westlake Village. The HOA package, the city Zoning Clearance and the County plan check all read one drawing set, so a committee comment on window placement is corrected once, before EPIC-LA sees it. Fuel modification plans, arborist reports and hillside soils reports are ordered in week one; each is a permit precondition.
Property managers, HOA boards and investors get a different conversation. Boards keep their review standards: Civil Code 4751 voids any CC&R ban on ADUs, but reasonable objective restrictions on color, materials and roof form survive, and we write the package for approval on the committee's monthly calendar. For an investor, the city code bars rentals under 30 days, no owner-occupancy requirement applies to a standard ADU, and we found no ordinance letting a Westlake Village ADU be sold separately, so the unit is long-term income or family housing. We also carry HOA maintenance contracts on both sides of the county line.
On an 8,000 sq ft basin lot the unit is usually a detached one-bedroom cottage of 850 sq ft or less, finished to the level of our custom home work. A newly built detached ADU permitted in 2026 also needs its own solar array under the 2025 Energy Code in most cases; a garage conversion does not. On a short First Neighborhood yard, converting the garage or adding an attached in-law suite through our home remodeling crew fits better. Las Virgenes Municipal Water District publishes no ADU meter rule, so we confirm a separate meter with the District. Crews dispatch from Ventura and work as ADU builders across Ventura County under our residential construction practice.
ADU Services in Westlake Village
- Detached backyard cottages & casitas
- Attached garage conversions
- Junior ADUs inside the house
- Zoning Clearance & EPIC-LA permit packages
- LA County Fire fuel modification plans
- WUI-code exterior specs for fire-zone lots
- HOA architectural committee submittals
- Panel upgrades & SCE coordination
- Sewer laterals & LVMWD water connections
- Fixed-price scope from design to keys
Reviews
What Our Clients Say
Rated 5.0 from 41 reviews on Google
FAQ
Westlake Village ADU - FAQ
Who is the best ADU builder in Westlake Village?
Ask two questions before you ask for a number. Has the builder filed a Zoning Clearance with the city and a plan check through EPIC-LA on the same project? Has it carried a fuel modification plan through LA County Fire's Forestry Division and a committee package through an HOA on the first pass? Master Construction is licensed and insured under Lic. #1027281, family owned in Ventura since 1994, and builds ADUs in Westlake Village with in-house electrical, plumbing, concrete, drywall, stucco and roofing crews. The same license that draws the unit builds it and finishes it to match the house.
How much does an ADU cost in Westlake Village?
Type and size set the base. A garage conversion reuses a slab, a roof and three walls; a detached cottage needs all of them new, plus a fuel modification plan and the WUI exterior package on a fire-zone lot. Utility runs are the second driver: the distance from the house to a rear-yard unit, the condition of a fifty-year-old sewer lateral, and whether a 100-amp panel can carry the load. Hillside pads add a soils report and engineered footings. Finish level moves the number more than square footage. We walk the lot, confirm the county line and the fire map, and price the unit as a written fixed-price scope.
How long does an ADU take to build in Westlake Village?
Approvals set the schedule. HOA architectural committees meet monthly, the city Zoning Clearance needs the HOA approval attached, and the County plan check runs through EPIC-LA with virtual engineer appointments. State law as of 2026 gives each agency 15 business days to declare an application complete and 60 days after that to approve or deny it. A fuel modification plan must be approved before the building permit issues, so on a fire-zone lot we file it first. A converted garage builds in a few months; a detached cottage with a new lateral and a panel upgrade takes longer. The fixed-price scope comes with a dated schedule.
Does Westlake Village have pre-approved ADU plans?
No. The City of Westlake Village publishes no pre-approved plans. Its ADU page sends owners to LA County Public Works Building & Safety, which offers Standard Notes and Details for converting a single-story garage under 1,200 sq ft or creating a JADU under 500 sq ft inside the house, with no added footprint. The County's three detached standard plans at 800 and 1,200 sq ft were written for unincorporated land, so we ask the Calabasas desk whether they are accepted on a city lot before designing around them. A detached unit here is usually custom-drawn anyway, because the code requires the exterior to match the main house.
Can I convert my garage into an ADU in Westlake Village?
Yes, and it is the lowest-cost path on most of these lots. Attached two-car garages are the norm in the 1960s to 1980s tracts and sit close to the electrical panel. State law waives replacement parking when a garage becomes an ADU, and a conversion keeps its existing setbacks. The County's standard notes cover a single-story garage under 1,200 sq ft with no added footprint. The work is a new front wall where the door was, insulation, a bathroom tied to the house drain, a kitchen and a separate entry. Your HOA may still weigh the lost parking, so we address it in the committee package.
Can I build an ADU on a Westlake Village lot in the Very High Fire Hazard Severity Zone?
Yes, with a longer checklist. A new habitable structure in the VHFHSZ needs a Fuel Modification Plan approved by LA County Fire's Forestry Division before the building permit issues, with three zones out to 200 ft or the property line, a recorded covenant and a final landscape inspection. The building itself is checked against the 2025 California Wildland-Urban Interface Code, formerly Chapter 7A: Class A roof, ember-resistant vents, ignition-resistant walls, multi-pane glazing with a tempered pane and rated doors. The city code text limits VHFHSZ lots to one ADU or one JADU; state law and HCD read that differently, and Planning will confirm what applies to your lot.
Can I rent out my ADU in Westlake Village?
Yes, for 30 days or longer. Municipal Code 9.14.070 records a covenant on the unit barring rentals under 30 days, so a Westlake Village ADU is a long-term rental, not a vacation listing. No owner-occupancy requirement applies to a standard ADU under state law. A JADU is different: as of 2026, owner occupancy applies only to a JADU that shares a bathroom with the main house. The unit cannot be sold separately from the house, and we found no city ordinance opting into the state's ADU condominium law. Tenants here tend to come from the business park north of the 101, the Four Seasons and Las Virgenes Unified families.
Can my HOA stop me from building an ADU in Westlake Village?
No, but it can shape the design. Civil Code 4751 voids any CC&R provision that bans or unreasonably restricts an ADU or JADU on a single-family lot. Reasonable objective standards survive, and committees here review color, materials, roof form, window placement and visibility from the street or the lake. Because the city's own code requires the ADU's materials and roof pitch to match the main house, a code-compliant design is most of the way to committee approval already. The city's Zoning Clearance form asks for proof of HOA approval, so we run the association package and the city package in parallel and time the submittal to the committee's monthly meeting.
Do you handle design, permits and construction for a Westlake Village ADU?
Yes, under one contract. We start with a feasibility read on the parcel: county line, fire map, hillside overlay, protected oaks, tract-specific standards, panel capacity and the sewer lateral. Design follows through our design-build practice, drawn to the city's matching rule and the HOA's guidelines at the same time. We file the HOA package, the city Zoning Clearance and the County plan check through EPIC-LA, order the fuel modification plan and any soils or arborist report, and build with our own electrical, plumbing, concrete, drywall, stucco and roofing crews. Crews dispatch from Ventura. Call (805) 667-8800 for the feasibility read.
Related Services
Detached units here are small custom builds, often under a fire-zone exterior spec. See custom homes in Westlake Village, design-build in Westlake Village and electrical in Westlake Village for the panel upgrade most units need.
Other Services in Westlake Village
ADU Construction in Nearby Cities
Inquiries
Parent Moving In and No Spare Room in the Westlake Village House?
Call (805) 667-8800 for a feasibility read on any Westlake Village lot, on either side of the county line.